Yearly Archives: 2023


Here are my photos of 650 Build so far …

Tail plane is all set pending final riveting. That includes horizontal stab, elevator, vertical stab, rudderControl surfaces are done pending few small items such as adding trim tab to aileron unit but flaps and both aileron primary surfaces are done Currently working on left wing and by EOD today, I was […]


Wings work started

Wing is in progress and definitely this is a bit more involved than the 750 cruiser wing I believe. Now it is a good breaking point with wing build for my 650 zenith… – Frame is set– nose ribs and rear ribs are located in position and drilled. – next steps […]