Quick update for last few days of work on my 650 build – Next is to check for final tolerances and rivet the wing skins so wing # 2 is doneski …kind of and start with fuselage
- top skin is final drilled and cleco’ed
- nose skin drilled to 30 size and ready for final drilling
- fuel tank installed with fuel sender installed from top of the wing
- Next is to check for final tolerances and rivet the wing skins so wing # 2 is doneski …kind of and start with fuselage-
- Wing top skin all drilled and cleco’ed to final size
- Botton wing all drilled and aligned flat and ready for final drilling
- Nose ribs installed