Installing canopy needs at least one helper who is quite knowledgeable in what to do. Using the acrylic drill bit, initial holes in plexiglass canopy were drilled followed by metal drill into the round hoop (tube) frame. Excess material was trimmed using metal circular grinder with cutting wheel to fit the frame of the canopy.
Once the initial setup is done then the main frame for the canopy was installed onto the fuselage followed by riveting the plexiglass canopy – shown is front main canopy here,













