To help with change of scenery – started working on tail section and Instrument panel of the 650 build.
- Installed the Horizontal stab and clecoed the elevator
- Connected the elevator trim servo and it’s wiring to be run inside the fuselage
- Worked on the instrument panel design on “www.hangarflying.com” just to get a feel for it …
So far — it’s coming along ok I guess …




